top of page
CHRISTCHURCH AIRPORT
Project Type
Scope
Storeys
Location
Year
Commercial
Scaffold Shrinkwrap
3
Christchurch
2014
As part of extensive airport renovations, ensuring weatherproof integrity during the process was crucial. DTCE designed and monitored scaffold which was required to be free-spanning for 23m across the terminal roof. The scaffold's lightweight composition posed a challenge due to its heightened susceptibility to wind loads, emphasizing the need for meticulous engineering.
bottom of page