民用
Fee estimator applicability
-
DTCE deliverables are suitable for Building Consent application. Including: PS1, LBP Memo, CM recs, B1/B2 compliance, Design Features Report, Calculations, Drawings and Specifications,
-
Architect led residential alterations or new builds,
-
Total project budget is within $3M,
-
Up to 3 storeys,
-
Lightweight timber framing and/or mixed with reinforced concrete block walls,
-
Single dwelling or townhouse. If there are multiple different buildings, use a separate calculation for each building.
Instructions
Fill out each question in the dropdown menu to determine the structural design scope.
How to complete this table:
For each item below, please enter the number of structural parts required in the “Select” field.
For example, if 4 SED beams are needed, choose 4 in the "Select" field.
If an item is not required, enter 0.
YOUR SCOPE & DELIVERABLES
Scala penetrometer and hand auger. A full geotechnical report is usually not needed for low rise lightweight residential projects.
Bracing can be diagonal timber braces, GIB, plywood or blockwalls.
If a portal is repeated across duplicated townhouses, it's only 1 portal frame design. But if there are different locations in a house then it's multiple portals.
This is additional to the bracing design because blockwalls have extra out of plane checks and detailing.
SED beams could be steel or timber or block masonry. An SED joist size or an SED rafter size counts as one size. Lintels count as one size. This assumes the posts and connection details will also be specified by the engineer.
Choose "Mixed" if the style of foundation design changes across the building, like there is a timber subfloor on part and concrete foundation on another part.
Like a traydeck slab
Stepped floor levels are much trickier to design and detail for.
If we are designing something that isn't traditional block or timber (for example spray and pinned wall, you can just assume 2 walls for pricing as it can take twice as long for a more special retaining wall)
Most balustrades don't need engineering input.
If there is a car deck then a crash barrier is very likely to be needed.
Just add 1 for each thing.
YOUR PROJECT ESTIMATE
-
Estimated Cost Range
Estimated Delivery Timeframe
Project Fee Breakdown:
Project Administration & Setup
Co-ordination with Project Team
On-Site Assessment & Investigation
Engineering Design & Report Writing
Structural Drawings and Specifications
Quality Assurance and Internal Review
Client Advice & Options Review
Please Note:
The structural fee breakdown is an estimate only and is intended for rough budgeting purposes.
For a fixed fee quote, please contact us
HOURLY RATE BREAKDOWN
Project Role and Hourly Rate Breakdown
Lead Engineer
$180.00
Site Technician
$150.00
CPEng Signatory
$320.00
Senior Drafter
$220.00
Total Estimate
ESTIMATE RANGE TOTAL
*
TO
EXCL GST
*
Please note:
Every project is different, and our fees are assessed individually depending on the scope, complexity, and specific project requirements. The structural fee breakdown is an estimate only and is intended for rough budgeting purposes.
For a fixed fee quote please contact us
