TRANSMISSION GULLY

Project Type

Scope

Storeys

Location

Year

Commercial

Enabling works engineering

Wellington

2015年

DTCE was engaged to provide structural advice and design on several parts of the Transmission Gully Enabling Works, including:
- Advice on construction vibration effects to an underground historic brick silo which was built to house diesel during the second world war.
- Designing temporary culverts to allow heavy machinery to access the gully.
- Designing the temporary site offices.
- Miscellaneous temporary structures such as site signs.